Independence Gold Unveils Major Mineral Discovery at 3Ts Project in British Columbia

WTS Capital
March 21, 2025

Independence Gold Corp. has announced significant drill results from its 3Ts Project in British Columbia, revealing promising gold and silver mineralization in the Johnny and Ted-Mint Vein Systems. This discovery is expected to enhance the upcoming resource update scheduled for the second quarter of 2025.

Key Takeaways

  • Independence Gold Corp. reports significant drill results from the Johnny and Ted-Mint Vein Systems.
  • Drill hole 3TS-25-05 returned 77.00 meters grading 4.04 g/t gold and 40.90 g/t silver.
  • Drill hole 3TS-24-28 returned 29.51 meters grading 5.59 g/t gold and 86.17 g/t silver.
  • Both vein systems remain open for further exploration, indicating potential for expansion.

Overview of the 3Ts Project

The 3Ts Project is located approximately 185 kilometers southwest of Prince George, British Columbia, covering 8,840 hectares in the Nechako Plateau region. It is strategically positioned near Artemis Gold Inc.'s Blackwater Mine and features a low-sulphidation epithermal quartz-carbonate vein district. The project has identified nineteen individual mineralized veins, with lengths ranging from 50 meters to over 1,100 meters and true widths up to 32 meters.

Significant Drill Results

Recent drilling has yielded some of the most promising results to date, particularly from the Johnny Vein System. The highlights include:

Drill Hole Target From (m) To (m) Interval (m) Gold (g/t) Silver (g/t)
3TS-24-28 Ted-Mint Vein System 38.40 67.91 29.51 5.59 86.17
3TS-25-05 Johnny Vein System 9.00 86.01 77.01 4.04 40.90

The Johnny Vein, initially identified in the mid-1990s, has been a focal point of Independence Gold's exploration efforts over the past two years. The recent drilling confirms that the Johnny Vein is part of a complex of gold-bearing quartz veins within a mineralized brecciated rhyolitic country rock.

Future Exploration Plans

Both the Johnny and Ted-Mint vein systems remain open along strike and at depth, suggesting significant potential for further mineralization. Ongoing drilling continues to test these veins and other mineralized structures, with assay results pending from SGS Canada.

Randy Turner, President and CEO of Independence Gold, expressed optimism about the results, stating, "These latest results reinforce the significant upside potential at 3Ts. The discovery of a broader vein system, coupled with grades comparable to our primary resource areas, strengthens our confidence in the growth potential of the Project."

Conclusion

As drilling progresses, Independence Gold is focused on delineating and expanding the known high-grade zones at the 3Ts Project. The proximity of the Johnny Vein System to the existing resource model underscores its potential to add additional ounces to the upcoming mineral resource estimate. With 8,700 meters of the planned 10,000-meter drilling program completed, the company is poised for continued success in its exploration endeavors.

Sources

Share

Related Articles

NexGen Energy’s Breakthrough: Landmark Discovery at Rook I

NexGen Energy announces its best-ever discovery-phase intercept at the Rook I property, revealing an expanded high-grade uranium zone and setting the stage for transformative exploration and future resource expansion.

Mar 25, 2025

Gold Royalty Corp. Achieves Record Revenue and Sets Ambitious Growth Targets for 2025

Gold Royalty Corp. reports record revenue for 2024 and sets ambitious growth targets for 2025, projecting significant increases in gold equivalent ounces.

Mar 24, 2025

Gold Royalty Corp. Achieves Record Revenue and Sets Ambitious Growth Targets for 2025

Gold Royalty Corp. reports record revenue for 2024 and sets ambitious growth targets for 2025, projecting significant increases in gold equivalent ounces.

Mar 22, 2025

Disclaimer

Welcome To Walk The Street

We're just a bunch of guys mixing up market news with our own brand of banter, giving you the lowdown on stocks with a twist at Walk The Street Capital.